Journal of Navigation and Port Research 2005;29(1):65-69.
Published online February 28, 2005.
인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구
구자윤, 김석재, 장은규
A Study on the Optimal Width of the Main Span in the 2nd Bridge of Incheon : (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span
Ja-Yun Koo, Seok-Jae Kim, Eun-Kyu Jang
Abstract
A construction project, of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship’s safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span, is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore, the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.
Key Words: SLAM 시뮬레이션 언어; Optimal Span;Width;Queueing Theory the Demurrage Cost;the Accumulation Cost of Freight;Simulation Language for Alternative Modelling;Transit Priority;Average Operational Utilization Level


ABOUT
BROWSE ARTICLES
FOR CONTRIBUTORS
Editorial Office
C1-327 Korea Maritime and Ocean University
727 Taejong-ro, Youngdo-gu, Busan 49112, Korea
Tel: +82-51-410-4127    Fax: +82-51-404-5993    E-mail: jkinpr@kmou.ac.kr                

Copyright © 2024 by Korean Institute of Navigation and Port Research.

Developed in M2PI

Close layer
prev next